2011 Project Work
Piedmont Natural Gas- Roanoke Rapides, NC
Piedmont Natural Gas- Clayton, NC
Piedmont Natural Gas- Castle Hayne, NC
- 2,100' of 10" pipe
- 10,564' of 6" pipe
2010 Project Work
Piedmont Natural Gas - Lumberton, NC
- Dupont Facilty Pipeline Project
- 52,686 LF of 6" steel
PSNC - Cleveland County, NC
- Southern Power Generation Project
- approximately 2,800' of 20" pipe
- station work
- conduit work
Carolina Gas Transmission- Akien, SC - Charleston, SC
- Hithcock Plaza and Cooper River
- two (2) 16" approximately 2500' drills (Aiken, SC)
- two (2) 16" approximately 1260' and 8060'
Piedmont Natural Gas - Dunn, NC
- Dunn Line 36L
- 29,591' of 6" and remive existing 3" pipe
Piedmont Natural Gas - Lillington, NC
- 3800' of 6" pipeline
- Lillington Bridge Replacement
Spectra Energy Transmission - Liberty, TX
- Moss Bluff Cavern 4 Expansion Project
- Line 84 New Construction & 16” Line 83 Uprate
- 2.3 miles of 30” new construction in super saturated soil conditions
- Cleared ROW & Built 2.3 mile mat road for all construction access and work space
- Hydrostatic test, clean & dry 2.3 miles of 30”
- Caliper run of 2.3 miles of 30”
- 16” critical outage and replacement of 900’ of pipe in multiple locations
- 16” HDD of environmentally sensitive Turtle Bayou – 508’
- Limited ROW access and work space
- Hydrostatic test 2.9 miles of 16”
- Chemically clean & dry 10 miles of 16”
- Fabricate and install 30” to 16” interconnect
- Fabricate and install 2 – 16” mainline valves
- Install 36x30” launcher/receiver
2009 Project Work
Piedmont Natural Gas - Tarboro, NC
- 4.5 miles of 6"
- 2700' wetland directional drill
Spectra Energy/East TN Natural Gas - Roanoke, VA
- Back Creek Crossing
- 370' of directional drill and tie-in
Southern Natural Gas - West Monroe, LA
- Pipeline intergrity and pigging work for 3 pipelines (24"-22"-18"-including installation of launchers and recievers, mainline valves and drip removals
Southern Natural Gas - Ellerslie, GA
- 24" Southmain Loop Line Pressure test
- 4.8 miles of hydrotesting
City of Monroe - Concord, NC
- 43 miles of 12" steel pipe with 1 ¼ conduit
2008 Project Work
Anandarko Pertroleum Corp. - Baggs, WY
- Jack Sparrow Project
- 70 plus miles of 4" to 20" PE gathering system work
Piedmont Natural Gas - Wilmington, NC
- Install 5200' of 10" steel pipe & station tie-ins
- Northeast Cape Fear River 10" HDD Crossing
EPCO - West Memphis, TN
- 4" miles of 12" pipe with assorted fabrication and station work
- Lion Oil/Valero Pipe
- 2 X 1200' HDD's
Piedmont Natural Gas - Wadesboro, NC
- 16" pipe line replacement
- 5 miles of 16" pipe
- 1300 CY of sensitive rock blasting between two hot lines
- 2500 CY of hammered rock
- Steep sloping terrain
- Two rock HDD's: 1250' and 750'
Piedmont Natural Gas - Wimington, NC
- 12 miles of 10" pipe
- North New Hanover System Strengthening Project
2007 Project Work
Anadarko Petroleum Corp. – Baggs, WY
- 90 miles of 4” through 20” polyethylene gas & water piping for "Sun Dog" coal bed methane well gathering
system
Southern Natural Gas/El Paso – Ellerslie, GA
- Complete replacement & hydrotest on 4 major transmission lines.
- 36”, 26”, 20” & 16”
- 1.5 Miles of each
- Rock conditions
- Depressurization, purging, cleaning, testing, pigging, repressurization
- Hazop procedures
Piedmont Natural Gas - Charlotte, NC
- Relocation of 12” & 16” gas transmission line at Charlotte Airport
- Two sections each, two phases
Piedmont Natural Gas - Wilmington, NC
- Fabricate and install 6”
- Launcher an receiver station
Siemens Building Technologies - Jackson, SC
Heath & Associates Engineers
- 16 miles of 12” polyethylene pipeline for landfill gas system
City of Sunset Beach/DOT - Sunset Beach, NC
- 12" Water line relocation
2006 Project Work
Northwest Alabama Gas District – Hamilton, AL
- 1,925’ of 4” PE Gas Line
- 1,131’ of 6” Rock Drill
- 911’ of distribution service lines, tees, & reconnections
- Landscape, asphalt, curb & gutter replacement
Praxair, Inc. - Theodore, AL
- 1,100' of 6" Nitrogen Pipeline relocation
- Removal and grouting of old pipeline
- Railroad Casing installation
Okaloosa Gas District
- Walton County Pipeline Expansion Project - Phase I
- Natural Gas Transmission Pipeline Project
- Blue Mountain Beach, FL to Freeport FL
- 16 miles of 10" transmission pipeline
- 3 miles of 8" transmission pipeline
- 4 miles of 4" transmission pipeline
- Record 8,400' intersect HDD of the Choctawhatchee Bay
- Heavily congested ROW with existing utilities; including multiple water, sewer, & power lines, and fiber
optic cables
- Fabrication, installation & tie-in of valve sites
Piedmont Natural Gas
- Natural Gas Transmission Pipeline Relocation Project
- Windsor, NC
- 2.11 miles of 12" transmission pipeline relocation
- Testing & tie-in to existing hot pipeline
City of Lexington
- Southmont Natural Gas System Expansion Phase I
- Natural Gas Distribution Pipeline Project
- Lexington, NC
- 7.42 miles of 6", 4", & 2" distribution pipeline
Florida Gas Transmission
- 12" Putnam Lateral Launcher & Receiver
- East Palatka, FL to Interlachen, FL
- Fabrication, installation, testing, & tie-in of six 12" valves and a 4" bypass
- Fabrication, installation, testing, & tie-in of 12" launcher & receiver
- Completion of all finish site work
2005 Project Work
Eastern NCNG, a Piedmont Natural Gas/APEC Company
- ENCNG Phase 6
- Natural Gas Transmission Pipeline Project
- Plymouth, NC to Swanquarter, NC
- 36 miles of 6” transmission pipeline
- Intercoastal Waterway HDD
- Installation & tie-in of valve/station sites
Eastern NCNG, a Piedmont Natural Gas/APEC Company
- ENCNG Phase 4B
- Natural Gas Transmission Pipeline Project
- Jacksonville, NC to Wallace, Burgaw, and Castle Hayne, NC
- 56 miles of 12” transmission pipeline
- 2,650’ Back Swamp HDD
- 4,417’ River Landing/I-40 HDD
- NCDOT right-of-way, narrow congested workspace
- Installation & tie-in of 8 valve/station sites
EasternNCNG, a Piedmont Natural Gas/APEC Company
- ENCNG Phase 3A
- Natural Gas Transmission Pipeline Project
- New Bern, NC to Bayboro, NC
- 19 miles of 6” transmission pipeline
- Installation & tie-in of valve sites
2004 Project Work
EasternNCNG, a Piedmont Natural Gas/APEC Company
- ENCNG Phase 7B
- Natural Gas Transmission Pipeline Project
- Point Harbor to Kitty Hawk, NC
- 5 miles of 6” transmission pipeline
- 15,713 Currituck Sound HDD
- NCDOT right-of-way, narrow congested workspace
- Installation & tie-in of valve sites
EasternNCNG, a Piedmont Natural Gas/APEC Company
- ENCNG Phase 3B
- Natural Gas Transmission Pipeline Project
- New Bern, NC to Havelock and to Morehead City, NC
- 37 miles of 8” transmission pipeline
- NCDOT right-of-way, narrow congested workspace
- Installation & tie-in of 10 valve sites
EasternNCNG, a Piedmont Natural Gas/APEC Company
- ENCNG Phase 5
- Natural Gas Transmission Pipeline Project
- Plymouth, NC to Columbia, NC
- 41 miles of 8” transmission pipeline
- 4,700’ Scuppernog River HDD
- Installation & tie-in of 10 valve sites
EasternNCNG, a Piedmont Natural Gas /APEC Company
- ENCNG Phase 3
- Natural Gas Transmission Pipeline Project
- Washington, NC to New Bern and to Jacksonville, NC
- 55 miles of 12” transmission pipeline
- 10 miles NCDOT right-of-way, narrow congested workspace
- 4,650’ Neuse River HDD
- 4,215’ White Oak River & 1,446’ Trent River HDD
- Fabrication, installation, and tie-in of 10 valve sites
North Carolina Natural Gas, a Piedmont Natural Gas Company
- The Landfall Community, Wilmington, NC
- 5 miles of 4” & 2” distribution pipeline through Wilmington’s most exclusive golf community
- 3,500’ of HDD, service installations, & landscape repair
2003 Project Work
EasternNCNG, a Piedmont Natural Gas /APEC Company
- ENCNG Phase 7a
- Natural Gas Transmission Pipeline Project
- Highway 168 – Baron, NC to Point Harbor, NC
- 27 miles of 6” transmission pipeline
- NCDOT right-of-way, narrow congested workspace
- 1,250’ Intercoastal Waterway HDD
- Fabrication, installation, and tie-in valve sites
EasternNCNG, a Piedmont Natural Gas /APEC Company
- ENCNG Phase 4a
- Natural Gas Transmission Pipeline Project
- Highway 421 – Wilmington, NC to Rocky Point, NC
- 11 miles of 12” transmission pipeline
- NCDOT right-of-way, narrow congested workspace
- 6,500’ First Cape Fear River HDD
- 5,500’ Second Cape Fear River HDD
- 1,700’ Cape Fear River Swamp HDD
- Fabrication, installation, and tie-in valve sites
2002 Project Work
North Carolina Natural Gas
- NCNG Right-Of-Way Maintenance Contract
- Side trimming, mowing, and/or tree removal
- 106 miles of NCNG transmission right-of-way
Eastern North Carolina Natural Gas, a Progress Energy/APEC Company
- ENCNG Phase II
- Natural Gas Transmission Pipeline Project
- Ahoskie, NC to Windsor, to Williamston, to Plymouth, and to Washington, NC
- 93 miles of 12" transmission pipeline
- NCDOT right of way, narrow congested workspace
- 2,500' Cashie River HDD
- 3,563' Roanoke River HDD
- 2,643 Tar River HDD - Rock Drill
- Fabrication, installation, and tie-in of 10 valve sites
- Plymouth Lateral Tap and the NCNG Washington Interconnect
North Carolina Natural Gas - Wilmington NC
- 23rd Street Pipeline Relocation Project
- 1,420' of 16" natural gas pipeline
- 1,340' directional drill
Eastern North Carolina Natural Gas, a Progress Energy/APEC Company
- ENCNG Phase 1
- 126 mile Natural Gas Transmission Pipeline Project
- Ahoskie, NC to Edenton, to Elizabeth City, to Moyock, and to Currituck, NC
- 12 miles of 12" transmission pipeline
- 65 miles of 10" transmission pipeline
- 8 miles of 8" transmission pipeline
- 47 miles of 6" transmission pipeline
- NCDOT right of way, narrow, congested workspace
- 1,565' Chowan River HDD
- 3,220' Perquimans River HDD
- 4,435' Pasquotank River HDD
- Fabrication, installation, and tie-in of 47 valve sites
North Carolina Natural Gas - Wilmington, NC
- Blanket Distribution Contractor 2001-2002
2001 & Earlier Project Work
CP&L / Progress Energy - Davidson, NC to Hamlet, NC
- 84 miles of 30" transmission line
- Paralled existing 16" high pressure gas main
- Over 3 miles of rock blasting
- 36,000' of wetland construction, 3 major swamp pushes
- 10,000' of concrete coated pipe
- Davidson Creek, Hendricks Swamp, I-85 intersection & Pee Dee River HDD
- Joint project with U.S. Pipeline, Inc.
CP&L/Progress Energy - Hamlet, NC
- 30" pipeline tie-in and extension project at CT site
North Carolina Natural Gas - Wilmington, NC
- Blanket Distribution Contractor 2001-2002
2000 and Earlier
North Carolina Natural Gas/CP&L
- Davidson, NC to Hamlet, NC
- 84 miles of 30" transmission pipeline
- paralleled 16" existing high pressure gas main
- over 3 miles of rock blasting
- 36,000' of wetland construction, 10,000' of concrete coated pipe
- 3 major swamp pushes
- Davidson Creek, Hendricks Swamp, I-85 intersection, and Pee Dee River directional drills
North Carolina Natural Gas
- Concord, NC
- 2,025' of 16" transmission line replacement
- 300' swamp installation
North Carolina Natural Gas
- Cofield, NC
- 4 miles of 6" pipe
- service line for a manufacturing plant
North Carolina Natural Gas
- Tarboro, NC
- 18,571' of 6" pipe
- 2,490' directional drill
North Carolina Natural Gas
- Kinston, NC
- 1.18 miles of 6" pipe
North Carolina Natural Gas
- Goldsboro, NC
- 2,840' of 24"
- directional drill of Neuse River
- congested right-of-way with power lines, water lines, and fiber optic cables
North Carolina Natural Gas
- Wilmington, NC
- Blanket Distribution Contractor, 2000-2001
South Carolina Pipeline Corporation
- Sumter, SC to Manning, SC
- 28 miles of 6" pipe
- 4,650' Pocotaligo Swamp directional drill
1999
North Carolina Natural Gas Warsaw to Jacksonville, NC
- 50 miles of 8”, 23,651’ directional drill
- 9.3 miles on Camp Lejeune Marine Corps Base
- 2,677’ rock directional drill, 14,948’ concrete coated pipe
- North Carolina Natural Gas Ahoskie to Hamilton, NC
- 40 miles of 12” pipe, plus 4 miles of 4” pipe
- 12,174’directional drill, 2,450’ rock directional drill
- 6,075’ concrete coated pipe
Town of Topsail Beach Topsail Beach, NC
- FEMA/Town – 6 miles of beach cleanup
- Supplied machinery, equipment, and personnel to
- collect, clean, and transport sand back to the beach.
CP&L/NCNG Goldsboro, NC
- 500’ of 20” Distribution Pipeline
North Carolina Natural Gas Wilmington, NC
- Blanket Distribution Contractor 1999-2000
North Carolina Natural Gas Statewide NC
Statewide Blanket ROW Maintenance Contractor
1998
North Carolina Natural Gas Benson, NC
- 11 miles of 6”, 2,100’ directional drill
- 1,400’ concrete coated pipe
Piedmont Natural Gas Salisbury, NC
- 9.5miles of 6”, 1 conventional lake crossing
Piedmont Natural Gas Mount Holly, NC
- 6 miles of 16”, 1300’ directional drill
Piedmont Natural Gas Spartanburg, SC
- 8.5 miles of 8”, 1,250’ directional drill
North Carolina Natural Gas Rockingham, NC
- 6” line relocation, 950’ rock directional drill
- 16” line relocation, section 1 - 532’, section 2 - 302’
North Carolina Natural Gas Rocky Mount, NC
North Carolina Natural Gas Turkey, NC
- 6.7 miles of 6” pipe, 1,800’ directional drill
Columbia Gas (Commonwealth Gas) Portsmouth, VA
- 6,000’ of 8” congested work, most by directional drill
North Carolina Natural Gas Mount Olive, NC
- 19 miles of 10” pipe, 2 miles of 8” pipe
- 6,600’ total directional bore
Citrus Energy Services (Enron Corp.) Polk County, FL
- 7 miles of 12” pipe, 1 mile of 20” pipe
North Carolina Natural Gas Richmond County, NC
- 7 miles of 16” pipe
- North Carolina Natural Gas Weldon, NC
- 1 mile of 16” relocation
North Carolina Natural Gas Wilmington, NC
- 1998 P.E. Gas Distribution Blanket Contractor
Town of Topsail Beach Topsail Beach, NC
- FEMA/Town – 6 miles of beach cleanup
- Supplied machinery, equipment, and personnel to collect, clean, and return sand to beach, recycling approx. 500,000 cubic yards.
Bean Horizon Corp. Boca Raton, FL
- Beach Re-nourishment Project: provided equipment and operators to rebuild 3 miles of beach.
Bean Horizon Corp. Cape Canaveral, FL
- Beach Re-nourishment Project: provided equipment and operators to rebuild approx. 3 miles of beach.
1997
Piedmont Natural Gas Anderson, SC
North Carolina Natural Gas Kinston, NC
- 8.5 miles of 6" pipe, 14,200' of concrete coated pipe
North Carolina Natural Gas Indian Trail, NC
- P.E. Gas Distribution work
North Carolina Natural Gas Smithfield, NC
- 1,791' of 8" P.E. Pipe, 1,224' of 8" P.E. Bore
- 7,154' of 6" P.E. Pipe, 2,738' of 6" P.E. Bore
North Carolina Natural Gas Wilmington, NC
- P.E. Gas Distribution work
North Carolina Natural Gas Monroe, NC
North Carolina Natural Gas Greenville, NC
North Carolina Natural Gas Rockingham, NC
South Carolina Pipeline Corp. Hartsville, SC
- Great Pee-Dee River crossing by directional bore
- (768' of 8” Pipe) & Meter Station
South Carolina Pipeline Corp. Bishopville, SC
- 3 miles of 4" Zap-Lok Pipe
Piedmont Natural Gas Winston Salem, NC & Greenville, SC
Bean Horizon Kure Beach, NC
- Beach Re-nourishment Project: provided equipment and operators to rebuild approx. 14 miles of beach.
1996
South Carolina Pipeline Corp. York, SC
- 38 miles of 16" pipe
- 1,850' Short Bore, 750' Directional Bore (I-77)
- 2,100' Directional Bore
- 17,307' Rock Excavation
Town of Topsail Beach Topsail Beach, NC
- FEMA/Town – 6 miles of beach cleanup
- Supplied machinery, equipment, and personnel to collect, clean, and return sand to the beach.
South Carolina Pipeline Corp. Chester/Lancaster/Kershaw Co.
- 44 miles of 16" pipe, 8,000' 16" concrete coated pipe
- 4,897' Conventional Bore, 1,075' River Directional Bore
- 231,678' Rock Excavation
1995
South Carolina Electric & Gas Hilton Head, SC
- Del Webb Project - 14 miles 10" Pipe
- 1 river crossing by directional drill
South Carolina Electric & Gas Allendale, SC
- 11 miles 6" pipe
- RR & road bores, 1 directional drill
Florida Gas Transmission Cape Kennedy, FL
- 2 miles 12" pipe
- bore under canal
Piedmont Natural Gas Charlotte, NC
- 8 miles 12" pipe, 1 creek crossing
- 2 directional bores
1994
Kissimmee Utility Authority Kissimmee, FL
- 7 miles 20" pipe
- 1 directional drill
Piedmont Natural Gas Kernersville/Salisbury/Charlotte, NC
- 13 miles 8", 12", 16", and 18" pipe
- West Florida Gas Company Panama City, FL
- 6 miles or 6” pipe
South Carolina Pipeline Corp. Lancaster, SC
Florida Gas Transmission Cape Kennedy, FL
- 7 miles 12" pipe
- 1 directional drill
North Carolina Natural Gas Newton Grove, NC
- 10 miles 12" pipe
- 1 directional drill
1993
North Carolina Natural Gas Green & Pitt Co., NC
South Carolina Pipeline Corp. Columbia, SC
City of Elberton Elberton, GA
City of Cuthbert Cuthbert, GA
City of Sylacauga Sylacauga, AL